§ 1595. Salinity control units; authority and functions of Secretary of the Interior
-
(a) Allocation of costs The Secretary shall allocate the total costs (excluding costs borne by non-Federal participants) of the on-farm measures authorized by section 1592(c) of this title, of all measures to replace incidental fish and wildlife values foregone, and of each unit or separable feature thereof authorized by section 1592(a) of this title, as follows: (1) In recognition of Federal responsibility for the Colorado River as an interstate stream and for international comity with Mexico, Federal ownership of the lands of the Colorado River Basin from which most of the dissolved salts originate, and the policy embodied in the Federal Water Pollution Control Act Amendments of 1972 (86 Stat. 816) [33 U.S.C. 1251 et seq.], 75 per centum of the total costs of construction, operation, maintenance, and replacement of each unit or separable feature thereof authorized by section 1592(a)(1), (2), and (3) of this title, including 75 per centum of the total costs of construction, operation, and maintenance of the associated measures to replace incidental fish and wildlife values foregone, 70 per centum of the total costs of construction, operation, maintenance, and replacement of each unit, or separable feature thereof authorized by paragraphs (4) through (6) of section 1592(a) of this title, including 70 per centum of the total costs of construction, operation, and maintenance of the associated measures to replace incidental fish and wildlife values foregone, and 70 per centum of the total costs of implementation of the on-farm measures authorized by section 1592(c) of this title, including 70 per centum of the total costs of the associated measures to replace incidental fish and wildlife values foregone, shall be nonreimbursable. The total costs remaining after these allocations shall be reimbursable as provided for in paragraphs (2), (3), (4), and (5), with interest calculated in the same manner as provided in subsection (a)(4)(iv) of this section. Any reimbursement due non-Federal entities pursuant to section 1592(b)(2) of this title shall be repaid without interest in the fiscal year next succeeding the fiscal year in which such operation and maintenance costs are incurred. (b) Costs payable from Lower Colorado River Basin Development Fund (1) Costs of construction, operation, maintenance, and replacement of each unit or separable feature thereof authorized by section 1592(a) of this title, costs of construction, operation, and maintenance of measures to replace incidental fish and wildlife values foregone, and costs of implementation of the on-farm measures authorized by section 1592(c) of this title, allocated for repayment by the lower basin under subsection (a)(2) of this section shall be paid in accordance with section 1543(g)(2) of this title, from the Lower Colorado River Basin Development Fund. (2) Omitted (c) Costs payable from Upper Colorado River Basin Fund Costs of construction, operation, maintenance, and replacement of each unit or separable feature thereof authorized by section 1592(a) of this title, costs of construction, operation, and maintenance of measures to replace incidental fish and wildlife values foregone, and costs of implementation of the on-farm measures authorized by section 1592(c) of this title allocated for repayment by the upper basin under subsection (a)(2) of this section shall be paid in accordance with section 620d(d)(5) of this title from the Upper Colorado River Basin Fund within the limit of the funds made available under subsection (e) of this section.
(d) Omitted (e) Upward adjustment of rates for electrical energy The Secretary is authorized to make upward adjustments in rates charged for electrical energy under all contracts administered by the Secretary under the Colorado River Storage Project Act (70 Stat. 105; 43 U.S.C. 620) as soon as practicable and to the extent necessary to cover the costs allocated to the Upper Colorado River Basin Fund under subsection (a)(2) of this section and in conformity with subsection (a)(3), subsection (a)(4) and subsection (a)(5) of this section: Provided, That revenues derived from said rate adjustments shall be available solely for the construction, operation, maintenance, and replacement of salinity control units, for the construction, operation, and maintenance of measures to replace incidental fish and wildlife values foregone, and for the implementation of on-farm measures in the Colorado River Basin herein authorized.
(f) Up-front cost share (1) In general Effective beginning on the date of enactment of this paragraph, subject to paragraph (3), the cost share obligations required by this section shall be met through an up-front cost share from the Basin Funds, in the same proportions as the cost allocations required under subsection (a), as provided in paragraph (2).
(2) Basin States Program The Secretary shall expend the required cost share funds described in paragraph (1) through the Basin States Program for salinity control activities established under section 1592(a)(7) of this title.
(3) Existing salinity control activities The cost share contribution required by this section shall continue to be met through repayment in a manner consistent with this section for all salinity control activities for which repayment was commenced prior to the date of enactment of this paragraph.
References In Text
The Federal Water Pollution Control Act Amendments of 1972, referred to in subsec. (a)(1), is Pub. L. 92–500,
Section 620d(d)(5) of this title, referred to in subsec. (c), was in the original a reference to “section 205(d) of this title”, meaning section 205(d) of title II of Pub. L. 93–320. Such section 205(d) amended section 5(d) of the Colorado River Storage Project Act by inserting a new par. (5), which is classified to section 620d(d)(5) of this title.
The Colorado River Storage Project Act, referred to in subsec. (d), is act Apr. 11, 1956, ch. 203, 70 Stat. 105, as amended, which is classified generally to chapter 12B (§ 620 et seq.) of this title. For complete classification of this Act to the Code, see Short Title note set out under section 620 of this title and Tables.
The date of enactment of this paragraph, referred to in subsec. (f)(1), (3), is the date of enactment of Pub. L. 110–246, which was approved
Codification
Pub. L. 110–234 and Pub. L. 110–246 made identical amendments to this section. The amendments by Pub. L. 110–234 were repealed by section 4(a) of Pub. L. 110–246.
Section is comprised of section 205 of Pub. L. 93–320. Subsecs. (b)(2) and (d) of section 205 of Pub. L. 93–320 amended sections 620d and 1543 of this title.
Amendments
2008—Subsec. (f). Pub. L. 110–246, § 2806(b)(2), added subsec. (f) and struck out former subsec. (f). Prior to amendment, text read as follows: “The Secretary may expend funds available in the Basin Funds referred to in this section to carry out cost-share salinity measures in a manner that is consistent with the cost allocations required under this section.”
1996—Subsec. (a). Pub. L. 104–127, § 336(c)(2)(A), struck out “pursuant to section 1592(c)(2)(C) of this title” after “non-Federal participants” in introductory provisions.
Subsec. (f). Pub. L. 104–127, § 336(c)(2)(B), added subsec. (f).
1995—Subsec. (a)(1). Pub. L. 104–20, § 1(2)(A), substituted “authorized by paragraphs (4) through (6) of section 1592(a)” for “authorized by section 1592(a)(4) and (5)”.
Subsec. (a)(4)(i). Pub. L. 104–20, § 1(2)(B), substituted “paragraphs (4) through (6) of section 1592” for “sections 1592(a)(4) and (5)” in two places.
1984—Subsec. (a). Pub. L. 98–569, § 4(a), inserted “(a)” after “section 1592” and inserted “(excluding costs borne by non-Federal participants pursuant to section 1592(c)(2)(C) of this title) of the on-farm measures authorized by section 1592(c) of this title, of all measures to replace incidental fish and wildlife values foregone, and” after “total costs”.
Subsec. (a)(1). Pub. L. 98–569, § 4(b), inserted “authorized by section 1592(a)(1), (2), and (3) of this title, including 75 per centum of the total costs of construction, operation, and maintenance of the associated measures to replace incidental fish and wildlife values foregone, 70 per centum of the total costs of construction, operation, maintenance, and replacement of each unit, or separable feature thereof authorized by section 1592(a)(4) and (5) of this title, including 70 per centum of the total costs of construction, operation, and maintenance of the associated measures to replace incidental fish and wildlife values foregone, and 70 per centum of the total costs of implementation of the on-farm measures authorized by section 1592(c) of this title, including 70 per centum of the total costs of the associated measures to replace incidental fish and wildlife values foregone,” after “shall be nonreimbursable” and further inserted “The total costs remaining after these allocations shall be reimbursable as provided for in paragraphs (2), (3), (4), and (5), of subsection (a) of this section” at the end thereof.
Subsec. (a)(3). Pub. L. 98–569, § 4(d), substituted “construction and replacement of each unit” for “construction, operation, maintenance, and replacement of each unit” before “or separable features thereof”, inserted “authorized by sections 1592(a)(1), (2), and (3) of this title and costs of construction of measures to replace incidental fish and wildlife values foregone, when such measures are a part of the units authorized by sections 1592(a)(1), (2), and (3) of this title” before “allocated”, and inserted “or within a period equal to the estimated life of the unit, separable feature thereof, or replacement, whichever is less,” before “without interest”.
Subsec. (a)(4), (5). Pub. L. 98–569, § 4(e), added pars. (4) and (5).
Subsec. (b). Pub. L. 98–569, § 4(f)(1), inserted “authorized by section 1592(a) of this title, costs of construction, operation, and maintenance of measures to replace incidental fish and wildlife values foregone, and costs of implementation of the on-farm measures authorized by section 1592(c) of this title,” before “allocated for repayment”.
Subsec. (c). Pub. L. 98–569, § 4(g), inserted “authorized by section 1592(a) of this title, costs of construction, operation, and maintenance of measures to replace incidental fish and wildlife values foregone, and costs of implementation of the on-farm measures authorized by section 1592(c) of this title” before “allocated for”.
Subsec. (e). Pub. L. 98–569, § 4(i), struck out “of construction, operation, maintenance, and replacement of units” before “allocated under”, inserted “to the Upper Colorado River Basin Fund” after “allocated”, inserted “, subsection (a)(4) and subsection (a)(5) of this section” after “subsection (a)(3)”, and inserted “, for the construction, operation and maintenance of measures to replace incidental fish and wildlife values foregone, and for the implementation of on-farm measures” after “salinity control units”.
Effective Date Of Amendment
Amendment of this section and repeal of Pub. L. 110–234 by Pub. L. 110–246 effective
Amendment by Pub. L. 98–569 effective
Miscellaneous
Advisory councils established after