United States Code (Last Updated: May 24, 2014) |
Title 43. PUBLIC LANDS |
Chapter 12. RECLAMATION AND IRRIGATION OF LANDS BY FEDERAL GOVERNMENT |
SubChapter I. GENERAL PROVISIONS |
§ 390h–12m. Mission Basin Brackish Groundwater Desalting Demonstration Project
Latest version.
-
(a) Authorization The Secretary, in cooperation with the City of Oceanside, is authorized to participate in the design, planning, and construction of a 3,000,000 gallon per day expansion of the Mission Basin Brackish Groundwater Desalting Demonstration Project in Oceanside, California.
(b) Cost share The Federal share of the cost of a project described in subsection (a) of this section shall not exceed 25 percent of the total cost.
(c) Limitation The Secretary shall not provide funds for the operation or maintenance of a project described in subsection (a) of this section.
(Pub. L. 102–575, title XVI, § 1627, as added Pub. L. 104–266, § 2(a)(2), Oct. 9, 1996 , 110 Stat. 3293.)