§ 390h–12m. Mission Basin Brackish Groundwater Desalting Demonstration Project  


Latest version.
  • (a) Authorization

    The Secretary, in cooperation with the City of Oceanside, is authorized to participate in the design, planning, and construction of a 3,000,000 gallon per day expansion of the Mission Basin Brackish Groundwater Desalting Demonstration Project in Oceanside, California.

    (b) Cost share

    The Federal share of the cost of a project described in subsection (a) of this section shall not exceed 25 percent of the total cost.

    (c) Limitation

    The Secretary shall not provide funds for the operation or maintenance of a project described in subsection (a) of this section.

(Pub. L. 102–575, title XVI, § 1627, as added Pub. L. 104–266, § 2(a)(2), Oct. 9, 1996, 110 Stat. 3293.)