§ 390h–12j. Orange County Regional Water Reclamation Project  


Latest version.
  • (a) Authorization

    The Secretary, in cooperation with the appropriate State and local authorities, is authorized to participate in the design, planning, and construction of the Orange County Regional Water Reclamation Project, to reclaim and reuse water within the service area of the Orange County Water District in California.

    (b) Cost share

    The Federal share of the cost of a project described in subsection (a) of this section shall not exceed 25 percent of the total cost.

    (c) Limitation

    The Secretary shall not provide funds for the operation or maintenance of a project described in subsection (a) of this section.

(Pub. L. 102–575, title XVI, § 1624, as added Pub. L. 104–266, § 2(a)(2), Oct. 9, 1996, 110 Stat. 3292; amended Pub. L. 111–11, title IX, § 9111(c), Mar. 30, 2009, 123 Stat. 1318.)

Amendments

Amendments

2009—Pub. L. 111–11, § 9111(c)(1), struck out “Phase 1 of the” before “Orange County” in section catchline.

Subsec. (a). Pub. L. 111–11, § 9111(c)(2), struck out “phase 1 of” before “the Orange County”.