United States Code (Last Updated: May 24, 2014) |
Title 42. THE PUBLIC HEALTH AND WELFARE |
Chapter 85. AIR POLLUTION PREVENTION AND CONTROL |
SubChapter I. PROGRAMS AND ACTIVITIES |
Part A. Air Quality and Emission Limitations |
§ 7410. State implementation plans for national primary and secondary ambient air quality standards
-
(a) Adoption of plan by State; submission to Administrator; content of plan; revision; new sources; indirect source review program; supplemental or intermittent control systems (1) Each State shall, after reasonable notice and public hearings, adopt and submit to the Administrator, within 3 years (or such shorter period as the Administrator may prescribe) after the promulgation of a national primary ambient air quality standard (or any revision thereof) under section 7409 of this title for any air pollutant, a plan which provides for implementation, maintenance, and enforcement of such primary standard in each air quality control region (or portion thereof) within such State. In addition, such State shall adopt and submit to the Administrator (either as a part of a plan submitted under the preceding sentence or separately) within 3 years (or such shorter period as the Administrator may prescribe) after the promulgation of a national ambient air quality secondary standard (or revision thereof), a plan which provides for implementation, maintenance, and enforcement of such secondary standard in each air quality control region (or portion thereof) within such State. Unless a separate public hearing is provided, each State shall consider its plan implementing such secondary standard at the hearing required by the first sentence of this paragraph. (2) Each implementation plan submitted by a State under this chapter shall be adopted by the State after reasonable notice and public hearing. Each such plan shall— (A) include enforceable emission limitations and other control measures, means, or techniques (including economic incentives such as fees, marketable permits, and auctions of emissions rights), as well as schedules and timetables for compliance, as may be necessary or appropriate to meet the applicable requirements of this chapter; (B) provide for establishment and operation of appropriate devices, methods, systems, and procedures necessary to— (i) monitor, compile, and analyze data on ambient air quality, and (ii) upon request, make such data available to the Administrator; (C) include a program to provide for the enforcement of the measures described in subparagraph (A), and regulation of the modification and construction of any stationary source within the areas covered by the plan as necessary to assure that national ambient air quality standards are achieved, including a permit program as required in parts C and D of this subchapter; (D) contain adequate provisions— (i) prohibiting, consistent with the provisions of this subchapter, any source or other type of emissions activity within the State from emitting any air pollutant in amounts which will— (I) contribute significantly to nonattainment in, or interfere with maintenance by, any other State with respect to any such national primary or secondary ambient air quality standard, or (II) interfere with measures required to be included in the applicable implementation plan for any other State under part C of this subchapter to prevent significant deterioration of air quality or to protect visibility, (ii) insuring compliance with the applicable requirements of sections 7426 and 7415 of this title (relating to interstate and international pollution abatement); (E) provide (i) necessary assurances that the State (or, except where the Administrator deems inappropriate, the general purpose local government or governments, or a regional agency designated by the State or general purpose local governments for such purpose) will have adequate personnel, funding, and authority under State (and, as appropriate, local) law to carry out such implementation plan (and is not prohibited by any provision of Federal or State law from carrying out such implementation plan or portion thereof), (ii) requirements that the State comply with the requirements respecting State boards under section 7428 of this title, and (iii) necessary assurances that, where the State has relied on a local or regional government, agency, or instrumentality for the implementation of any plan provision, the State has responsibility for ensuring adequate implementation of such plan provision; (F) require, as may be prescribed by the Administrator— (i) the installation, maintenance, and replacement of equipment, and the implementation of other necessary steps, by owners or operators of stationary sources to monitor emissions from such sources, (ii) periodic reports on the nature and amounts of emissions and emissions-related data from such sources, and (iii) correlation of such reports by the State agency with any emission limitations or standards established pursuant to this chapter, which reports shall be available at reasonable times for public inspection; (G) provide for authority comparable to that in section 7603 of this title and adequate contingency plans to implement such authority; (H) provide for revision of such plan— (i) from time to time as may be necessary to take account of revisions of such national primary or secondary ambient air quality standard or the availability of improved or more expeditious methods of attaining such standard, and (ii) except as provided in paragraph (3)(C), whenever the Administrator finds on the basis of information available to the Administrator that the plan is substantially inadequate to attain the national ambient air quality standard which it implements or to otherwise comply with any additional requirements established under this chapter; (I) in the case of a plan or plan revision for an area designated as a nonattainment area, meet the applicable requirements of part D of this subchapter (relating to nonattainment areas); (J) meet the applicable requirements of section 7421 of this title (relating to consultation), section 7427 of this title (relating to public notification), and part C of this subchapter (relating to prevention of significant deterioration of air quality and visibility protection); (K) provide for— (i) the performance of such air quality modeling as the Administrator may prescribe for the purpose of predicting the effect on ambient air quality of any emissions of any air pollutant for which the Administrator has established a national ambient air quality standard, and (ii) the submission, upon request, of data related to such air quality modeling to the Administrator; (L) require the owner or operator of each major stationary source to pay to the permitting authority, as a condition of any permit required under this chapter, a fee sufficient to cover— (i) the reasonable costs of reviewing and acting upon any application for such a permit, and (ii) if the owner or operator receives a permit for such source, the reasonable costs of implementing and enforcing the terms and conditions of any such permit (not including any court costs or other costs associated with any enforcement action), until such fee requirement is superseded with respect to such sources by the Administrator’s approval of a fee program under subchapter V of this chapter; and (M) provide for consultation and participation by local political subdivisions affected by the plan. (3) (A) Repealed. Pub. L. 101–549, title I, § 101(d)(1), Nov. 15, 1990 , 104 Stat. 2409.(B) As soon as practicable, the Administrator shall, consistent with the purposes of this chapter and the Energy Supply and Environmental Coordination Act of 1974 [15 U.S.C. 791 et seq.], review each State’s applicable implementation plans and report to the State on whether such plans can be revised in relation to fuel burning stationary sources (or persons supplying fuel to such sources) without interfering with the attainment and maintenance of any national ambient air quality standard within the period permitted in this section. If the Administrator determines that any such plan can be revised, he shall notify the State that a plan revision may be submitted by the State. Any plan revision which is submitted by the State shall, after public notice and opportunity for public hearing, be approved by the Administrator if the revision relates only to fuel burning stationary sources (or persons supplying fuel to such sources), and the plan as revised complies with paragraph (2) of this subsection. The Administrator shall approve or disapprove any revision no later than three months after its submission. (C) Neither the State, in the case of a plan (or portion thereof) approved under this subsection, nor the Administrator, in the case of a plan (or portion thereof) promulgated under subsection (c) of this section, shall be required to revise an applicable implementation plan because one or more exemptions under section 7418 of this title (relating to Federal facilities), enforcement orders under section 7413(d) effectiveness, need for revision, or implementation of any plan or plan revision required under this chapter.
References In Text
The Energy Supply and Environmental Coordination Act of 1974, referred to in subsec. (a)(3)(B), is Pub. L. 93–319,
Section 7413 of this title, referred to in subsecs. (a)(3)(C), (6), (f)(5), (g)(3), and (i), was amended generally by Pub. L. 101–549, title VII, § 701,
Section 1857c–10 of this title, as in effect before
Codification
Section was formerly classified to section 1857c–5 of this title.
Prior Provisions
A prior section 110 of act
Amendments
1990—Subsec. (a)(1). Pub. L. 101–549, § 101(d)(8), substituted “3 years (or such shorter period as the Administrator may prescribe)” for “nine months” in two places.
Subsec. (a)(2). Pub. L. 101–549, § 101(b), amended par. (2) generally, substituting present provisions for provisions setting the time within which the Administrator was to approve or disapprove a plan or portion thereof and listing the conditions under which the plan or portion thereof was to be approved after reasonable notice and hearing.
Subsec. (a)(3)(A). Pub. L. 101–549, § 101(d)(1), struck out subpar. (A) which directed Administrator to approve any revision of an implementation plan if it met certain requirements and had been adopted by the State after reasonable notice and public hearings.
Subsec. (a)(3)(D). Pub. L. 101–549, § 101(d)(1), struck out subpar. (D) which directed that certain implementation plans be revised to include comprehensive measures and requirements.
Subsec. (a)(4). Pub. L. 101–549, § 101(d)(2), struck out par. (4) which set forth requirements for review procedure.
Subsec. (c)(1). Pub. L. 101–549, § 102(h), amended par. (1) generally, substituting present provisions for provisions relating to preparation and publication of regulations setting forth an implementation plan, after opportunity for a hearing, upon failure of a State to make required submission or revision.
Subsec. (c)(2)(A). Pub. L. 101–549, § 101(d)(3)(A), struck out subpar. (A) which required a study and report on necessity of parking surcharge, management of parking supply, and preferential bus/carpool lane regulations to achieve and maintain national primary ambient air quality standards.
Subsec. (c)(2)(C). Pub. L. 101–549, § 101(d)(3)(B), struck out subpar. (C) which authorized suspension of certain regulations and requirements relating to management of parking supply.
Subsec. (c)(4). Pub. L. 101–549, § 101(d)(3)(C), struck out par. (4) which permitted Governors to temporarily suspend measures in implementation plans relating to retrofits, gas rationing, and reduction of on-street parking.
Subsec. (c)(5)(B). Pub. L. 101–549, § 101(d)(3)(D), struck out “(including the written evidence required by part D),” after “include comprehensive measures”.
Subsec. (d). Pub. L. 101–549, § 101(d)(4), struck out subsec. (d) which defined an applicable implementation plan for purposes of this chapter.
Subsec. (e). Pub. L. 101–549, § 101(d)(5), struck out subsec. (e) which permitted an extension of time for attainment of a national primary ambient air quality standard.
Subsec. (f)(1). Pub. L. 101–549, § 412, inserted “or of any requirement under section 7651j of this title (concerning excess emissions penalties or offsets)” in subpar. (A) and in last sentence.
Subsec. (g)(1). Pub. L. 101–549, § 101(d)(6), substituted “12 months of submission of the proposed plan revision” for “the required four month period” in closing provisions.
Subsec. (h)(1). Pub. L. 101–549, § 101(d)(7), substituted “5 years after
Subsecs. (k) to (n). Pub. L. 101–549, § 101(c), added subsecs. (k) to (n).
Subsec. (o). Pub. L. 101–549, § 107(c), added subsec. (o).
Subsec. (p). Pub. L. 101–549, § 108(d), added subsec. (p).
1981—Subsec. (a)(3)(C). Pub. L. 97–23 inserted reference to extensions of compliance in decrees entered under section 7413(e) of this title (relating to iron- and steel-producing operations).
1977—Subsec. (a)(2)(A). Pub. L. 95–95, § 108(a)(1), substituted “(A) except as may be provided in subparagraph (I)(i) in the case of a plan” for “(A)(i) in the case of a plan”.
Subsec. (a)(2)(B). Pub. L. 95–95, § 108(a)(2), substituted “transportation controls, air quality maintenance plans, and preconstruction review of direct sources of air pollution as provided in subparagraph (D)” for “land use and transportation controls”.
Subsec. (a)(2)(D). Pub. L. 95–95, § 108(a)(3), substituted “it includes a program to provide for the enforcement of emission limitations and regulation of the modification, construction, and operation of any stationary source, including a permit program as required in parts C and D and a permit or equivalent program for any major emitting facility, within such region as necessary to assure (i) that national ambient air quality standards are achieved and maintained, and (ii) a procedure” for “it includes a procedure”.
Subsec. (a)(2)(E). Pub. L. 95–95, § 108(a)(4), substituted “it contains adequate provisions (i) prohibiting any stationary source within the State from emitting any air pollutant in amounts which will (I) prevent attainment or maintenance by any other State of any such national primary or secondary ambient air quality standard, or (II) interfere with measures required to be included in the applicable implementation plan for any other State under part C to prevent significant deterioration of air quality or to protect visibility, and (ii) insuring compliance with the requirements of section 7426 of this title, relating to interstate pollution abatement” for “it contains adequate provisions for intergovernmental cooperation, including measures necessary to insure that emissions of air pollutants from sources located in any air quality control region will not interfere with the attainment or maintenance of such primary or secondary standard in any portion of such region outside of such State or in any other air quality control region”.
Subsec. (a)(2)(F). Pub. L. 95–95, § 108(a)(5), added cl. (vi).
Subsec. (a)(2)(H). Pub. L. 95–190, § 14(a)(1), substituted “1977;” for “1977”.
Pub. L. 95–95, § 108(a)(6), inserted “except as provided in paragraph (3)(C),” after “or (ii)” and “or to otherwise comply with any additional requirements established under the Clean Air Act Amendments of 1977” after “to achieve the national ambient air quality primary or secondary standard which it implements”.
Subsec. (a)(2)(I). Pub. L. 95–95, § 108(b), added subpar. (I).
Subsec. (a)(2)(J). Pub. L. 95–190, § 14(a)(2), substituted “; and” for “, and”.
Pub. L. 95–95, § 108(b), added subpar. (J).
Subsec. (a)(2)(K). Pub. L. 95–95, § 108(b) added subpar. (K).
Subsec. (a)(3)(C). Pub. L. 95–95, § 108(c), added subpar. (C).
Subsec. (a)(3)(D). Pub. L. 95–190, § 14(a)(4), added subpar. (D).
Subsec. (a)(5). Pub. L. 95–95, § 108(e), added par. (5).
Subsec. (a)(5)(D). Pub. L. 95–190, § 14(a)(3), struck out “preconstruction or premodification” before “review”.
Subsec. (a)(6). Pub. L. 95–95, § 108(e), added par. (6).
Subsec. (c)(1). Pub. L. 95–95, § 108(d)(1), (2), substituted “plan which meets the requirements of this section” for “plan for any national ambient air quality primary or secondary standard within the time prescribed” in subpar. (A) and, in provisions following subpar. (C), directed that any portion of a plan relating to any measure described in first sentence of 7421 of this title (relating to consultation) or the consultation process required under such section 7421 of this title not be required to be promulgated before the date eight months after such date required for submission.
Subsec. (c)(3) to (5). Pub. L. 95–95, § 108(d)(3), added pars. (3) to (5).
Subsec. (d). Pub. L. 95–95, § 108(f), substituted “and which implements the requirements of this section” for “and which implements a national primary or secondary ambient air quality standard in a State”.
Subsec. (f). Pub. L. 95–95, § 107(a), substituted provisions relating to the handling of national or regional energy emergencies for provisions relating to the postponement of compliance by stationary sources or classes of moving sources with any requirement of applicable implementation plans.
Subsec. (g). Pub. L. 95–95, § 108(g), added subsec. (g) relating to publication of comprehensive document.
Pub. L. 95–95, § 107(b), added subsec. (g) relating to Governor’s authority to issue temporary emergency suspensions.
Subsec. (h). Pub. L. 95–190, § 14(a)(5), redesignated subsec. (g), added by Pub. L. 95–95, § 108(g), as (h). Former subsec. (h) redesignated (i).
Subsec. (i). Pub. L. 95–190, § 14(a)(5), redesignated subsec. (h), added by Pub. L. 95–95, § 108(g), as (i). Former subsec. (i) redesignated (j) and amended.
Subsec. (j). Pub. L. 95–190 § 14(a)(5), (6), redesignated subsec. (i), added by Pub. L. 95–95, § 108(g), as (j) and in subsec. (j) as so redesignated, substituted “will enable such source” for “at such source will enable it”.
1974—Subsec. (a)(3). Pub. L. 93–319, § 4(a), designated existing provisions as subpar. (A) and added subpar. (B).
Subsec. (c). Pub. L. 93–319, § 4(b), designated existing provisions as par. (1) and existing pars. (1), (2), and (3) as subpars. (A), (B), and (C), respectively, of such redesignated par. (1), and added par. (2).
Effective Date Of Amendment
Amendment by Pub. L. 95–95 effective
Miscellaneous
Suits, actions, and other proceedings lawfully commenced by or against the Administrator or any other officer or employee of the United States in his official capacity or in relation to the discharge of his official duties under act
All rules, regulations, orders, determinations, contracts, certifications, authorizations, delegations, or other actions duly issued, made, or taken by or pursuant to act
Nothing in the Clean Air Act Amendments of 1977 [Pub. L. 95–95] to affect any requirement of an approved implementation plan under this section or any other provision in effect under this chapter before
Savings
Pub. L. 91–604, § 16,
Miscellaneous
“Federal Energy Administrator”, for purposes of this chapter, to mean Administrator of Federal Energy Administration established by Pub. L. 93–275,
Federal Energy Administration terminated and functions vested by law in Administrator thereof transferred to Secretary of Energy (unless otherwise specifically provided) by sections 7151(a) and 7293 of this title.