§ 2366a. Major defense acquisition programs: certification required before Milestone A approval
-
(a) Certification.— A major defense acquisition program may not receive Milestone A approval or otherwise be initiated prior to Milestone B approval until the Milestone Decision Authority certifies, after consultation with the Joint Requirements Oversight Council on matters related to program requirements and military needs— (1) that the program fulfills an approved initial capabilities document; (2) that the program is being executed by an entity with a relevant function as identified by the Secretary of Defense under section 118b of this title; (3) if the program duplicates a capability already provided by an existing system, the duplication provided by such program is necessary and appropriate; (4) that a determination of applicability of core logistics capabilities requirements has been made; (5) that an analysis of alternatives has been performed consistent with study guidance developed by the Director of Cost Assessment and Program Evaluation; and (6) that a cost estimate for the program has been submitted, with the concurrence of the Director of Cost Assessment and Program Evaluation, and that the level of resources required to develop, procure, and sustain the program is consistent with the priority level assigned by the Joint Requirements Oversight Council. (b) Notification.— (1) With respect to a major defense acquisition program certified by the Milestone Decision Authority under subsection (a) or a designated major subprogram of such program, if the projected cost of the program or subprogram, at any time prior to Milestone B approval, exceeds the cost estimate for the program submitted at the time of the certification by at least 25 percent, or the program manager determines that the period of time required for the delivery of an initial operational capability is likely to exceed the schedule objective established pursuant to section 181(b)(5) of this title by more than 25 percent, the program manager for the program concerned shall notify the Milestone Decision Authority. The Milestone Decision Authority, in consultation with the Joint Requirements Oversight Council on matters related to program requirements and military needs, shall determine whether the level of resources required to develop and procure the program remains consistent with the priority level assigned by the Joint Requirements Oversight Council. The Milestone Decision Authority may withdraw the certification concerned or rescind Milestone A approval if the Milestone Decision Authority determines that such action is in the interest of national defense. (2) Not later than 30 days after a program manager submits a notification to the Milestone Decision Authority pursuant to paragraph (1) with respect to a major defense acquisition program or designated major subprogram, the Milestone Decision Authority shall submit to the congressional defense committees a report that— (A) identifies the root causes of the cost or schedule growth in accordance with applicable policies, procedures, and guidance; (B) identifies appropriate acquisition performance measures for the remainder of the development of the program; and (C) includes one of the following: (i) A written certification (with a supporting explanation) stating that— (I) the program is essential to national security; (II) there are no alternatives to the program that will provide acceptable military capability at less cost; (III) new estimates of the development cost or schedule, as appropriate, are reasonable; and (IV) the management structure for the program is adequate to manage and control program development cost and schedule. (ii) A plan for terminating the development of the program or withdrawal of Milestone A approval if the Milestone Decision Authority determines that such action is in the interest of national defense. (c) Definitions.— In this section: (1) The term “major defense acquisition program” has the meaning provided in section 2430 of this title. (2) The term “designated major subprogram” means a major subprogram of a major defense acquisition program designated under section 2430a(a)(1) of this title. (3) The term “initial capabilities document” means any capabilities requirement document approved by the Joint Requirements Oversight Council that establishes the need for a materiel approach to resolve a capability gap. (4) The term “technology development program” means a coordinated effort to assess technologies and refine user performance parameters to fulfill a capability gap identified in an initial capabilities document. (5) The term “entity” means an entity listed in section 118b(c)(3) of this title. (6) The term “Milestone B approval” has the meaning provided that term in section 2366(e)(7) of this title. (7) The term “core logistics capabilities” means the core logistics capabilities identified under section 2464(a) of this title.
Prior Provisions
A prior section 2366a was renumbered section 2366b of this title.
Amendments
2013—Pub. L. 112–239, § 1076(a)(10)(C), made technical amendment to directory language of Pub. L. 112–81, § 801(e)(1)(A). See 2011 Amendment note below.
Subsec. (a)(4). Pub. L. 112–239, § 322(e)(1), substituted “core logistics capabilities” for “core depot-level maintenance and repair capabilities”.
Subsec. (a)(5), (6). Pub. L. 112–239, § 1076(a)(10)(A), made technical amendment to directory language of Pub. L. 112–81, § 801(a)(1)(B). See 2011 Amendment notes below.
Subsec. (c)(7). Pub. L. 112–239, § 1076(a)(10)(B), made technical amendment to directory language of Pub. L. 112–81, § 801(a)(2). See 2011 Amendment note below.
Pub. L. 112–239, § 322(e)(1), substituted “core logistics capabilities” for “core depot-level maintenance and repair capabilities” in two places.
2011—Pub. L. 112–81, § 801(e)(1)(A), as amended by Pub. L. 112–239, § 1076(a)(10)(C), struck out “or Key Decision Point A” after “Milestone A” in section catchline.
Subsec. (a). Pub. L. 112–81, § 801(e)(1)(B), struck out “, or Key Decision Point A approval in the case of a space program,” after “Milestone A approval” and “, or Key Decision Point B approval in the case of a space program,” after “Milestone B approval” in introductory provisions.
Subsec. (a)(2). Pub. L. 112–81, § 801(a)(1)(A), substituted “function” for “core competency”.
Subsec. (a)(4). Pub. L. 112–81, § 801(a)(1)(C), added par. (4). Former par. (4) redesignated (5).
Subsec. (a)(5). Pub. L. 112–81, § 801(a)(1)(B), as amended by Pub. L. 112–239, § 1076(a)(10)(A), redesignated par. (4) as (5). Former par. (5) redesignated (6).
Subsec. (a)(6). Pub. L. 112–81, § 801(a)(1)(D), substituted “develop, procure, and sustain” for “develop and procure”.
Pub. L. 112–81, § 801(a)(1)(B), as amended by Pub. L. 112–239, § 1076(a)(10)(A), redesignated par. (5) as (6).
Subsec. (b)(1). Pub. L. 112–81, § 801(e)(1)(C)(i), struck out “(or Key Decision Point A approval in the case of a space program)” after “Milestone A approval”.
Pub. L. 111–383, § 814(b)(1)(A), substituted “a major defense acquisition program certified by the Milestone Decision Authority under subsection (a) or a designated major subprogram of such program, if the projected cost of the program or subprogram” for “a major defense acquisition program certified by the Milestone Decision Authority under subsection (a), if the projected cost of the program”.
Subsec. (b)(2). Pub. L. 111–383, § 814(b)(1)(B), inserted “or designated major subprogram” after “major defense acquisition program”.
Subsec. (b)(2)(C)(ii). Pub. L. 112–81, § 801(e)(1)(C)(ii), struck out “, or Key Decision Point A approval in the case of a space program,” after “Milestone A approval”.
Subsec. (c). Pub. L. 111–383, § 1075(b)(33)(A), inserted a space after “(c)”.
Subsec. (c)(2) to (5). Pub. L. 111–383, § 814(b)(2), added par. (2) and redesignated former pars. (2) to (4) as (3) to (5), respectively. Former par. (5) redesignated (6).
Pub. L. 111–383, § 1075(b)(33)(B), which directed substitution of “section 118b(c)(3) of this title” for “section 125a(a) of this title” in par. (4), was executed by making the substitution in par. (5) to reflect the probable intent of Congress and the amendment by Pub. L. 111–383, § 814(b)(2)(A). See above.
Subsec. (c)(6). Pub. L. 111–383, § 814(b)(2)(A), redesignated par. (5) as (6).
Subsec. (c)(7). Pub. L. 112–81, § 801(a)(2), as amended by Pub. L. 112–239, § 1076(a)(10)(B), added par. (7).
2009—Subsec. (a). Pub. L. 111–23, § 204(a), substituted “may not receive Milestone A approval, or Key Decision Point A approval in the case of a space program, or otherwise be initiated prior to Milestone B approval, or Key Decision Point B approval in the case of a space program,” for “may not receive Milestone A approval, or Key Decision Point A approval in the case of a space program,” in introductory provisions.
Subsec. (a)(3). Pub. L. 111–23, § 201(e)(1), struck out “and” at end.
Subsec. (a)(4). Pub. L. 111–23, § 201(e)(3), added par. (4). Former par. (4) redesignated (5).
Pub. L. 111–23, § 101(d)(3), inserted “, with the concurrence of the Director of Cost Assessment and Program Evaluation,” after “has been submitted”.
Subsec. (a)(5). Pub. L. 111–23, § 201(e)(2), redesignated par. (4) as (5).
Subsec. (b). Pub. L. 111–23, § 204(b), designated existing provisions as par. (1), substituted “by at least 25 percent, or the program manager determines that the period of time required for the delivery of an initial operational capability is likely to exceed the schedule objective established pursuant to section 181(b)(5) of this title by more than 25 percent,” for “by at least 25 percent,”, and added par. (2).
2008—Pub. L. 110–417, § 813(b), renumbered section 2366b of this title as this section.
Subsec. (a)(1), (2). Pub. L. 110–417, § 813(e)(1)(A), substituted “program” for “system”.
Subsec. (a)(3). Pub. L. 110–417, § 813(e)(1)(B), substituted “if the program” for “if the system” and “such program” for “such system”.
Subsec. (a)(4). Pub. L. 110–417, § 813(e)(1)(A), substituted “program” for “system” in two places.
Subsec. (b). Pub. L. 110–417, § 813(e)(1)(C), substituted “major defense acquisition program” for “major system”, “cost of the program” for “cost of the system”, “estimate for the program” for “estimate for the system”, “the program concerned” for “the system concerned”, and “procure the program” for “procure the system”.
Subsec. (c)(1). Pub. L. 110–417, § 813(e)(1)(D), substituted “ ‘major defense acquisition program’ ” for “ ‘major system’ ” and “2430” for “2302(5)”.
Effective Date Of Amendment
Pub. L. 112–239, div. A, title III, § 322(f),
Pub. L. 112–239, div. A, title X, § 1076(a),
Effective Date
Pub. L. 110–181, div. A, title IX, § 943(c),
Miscellaneous
Pub. L. 112–81, div. A, title VIII, § 801(c),
Pub. L. 112–81, div. A, title VIII, § 801(d),
Pub. L. 111–23, title II, § 204(c),
Pub. L. 110–181, div. A, title IX, § 943(b),