United States Code (Last Updated: May 24, 2014) |
Title 50. WAR AND NATIONAL DEFENSE |
Chapter 42. ATOMIC ENERGY DEFENSE PROVISIONS |
SubChapter II. NUCLEAR WEAPONS STOCKPILE MATTERS |
Part B. Tritium |
§ 2545. Procedures for meeting tritium production requirements
Latest version.
-
(a) Production of new tritium The Secretary of Energy shall produce new tritium to meet the requirements of the Nuclear Weapons Stockpile Memorandum at the Tennessee Valley Authority Watts Bar or Sequoyah nuclear power plants consistent with the Secretary’s
December 22, 1998 , decision document designating the Secretary’s preferred tritium production technology.(b) Support To support the method of tritium production set forth in subsection (a), the Secretary shall design and construct a new tritium extraction facility in the H-Area of the Savannah River Site, Aiken, South Carolina.
(c) Design and engineering development The Secretary shall— (1) complete preliminary design and engineering development of the Accelerator Production of Tritium technology design as a backup source of tritium to the source set forth in subsection (a) and consistent with the Secretary’s December 22, 1998 , decision document; and(2) make available those funds necessary to complete engineering development and demonstration, preliminary design, and detailed design of key elements of the system consistent with the Secretary’s decision document of December 22, 1998 .
(Pub. L. 107–314, div. D, title XLII, § 4235, formerly Pub. L. 106–65, div. C, title XXXI, § 3134, Oct. 5, 1999 , 113 Stat. 927; renumbered Pub. L. 107–314, div. D, title XLII, § 4235, by Pub. L. 108–136, div. C, title XXXI, § 3141(e)(20), Nov. 24, 2003 , 117 Stat. 1762.)