United States Code (Last Updated: May 24, 2014) |
Title 43. PUBLIC LANDS |
Chapter 22. RIGHTS-OF-WAY AND OTHER EASEMENTS IN PUBLIC LANDS |
§ 942–4. Filing preliminary survey, map and profile of road
-
Any company mentioned in sections 687a, 687a–2 to 687a–5, and 942–1 to 942–9 of this title and sections 607a and 615a of title 16, by filing with the Secretary of the Interior a preliminary actual survey and plat of its proposed route, shall have the right at any time within one year thereafter to file the map and profile of definite location and such preliminary survey and plat shall during the said period of one year from the time of filing the same have the effect to render all the lands on which said preliminary survey and plat shall pass subject to the right of way mentioned in section 942–3 of this title.
Prospective Amendment
Section repealed by Pub. L. 94–579, title VII, § 706(a),
References In Text
Sections 687a and 687a–2 to 687a–5 of this title, referred to in text, were repealed by Pub. L. 94–579, title VII, §§ 703(a), 704(a),
Codification
Section is comprised of the proviso of section 4 of act
Section was formerly classified to section 414 of Title 48, Territories and Insular Possessions.
Savings
Repeal by Pub. L. 94–579 insofar as applicable to the issuance of rights-of-way not to be construed as terminating any valid lease, permit, patent, etc., existing on
Miscellaneous
The time of the Western Alaska Construction Company to comply with the provisions of this section and section 942–6 of this title, in acquiring and completing its railroad, was extended by act Apr. 9, 1904, ch. 1165, 33 Stat. 165.