§ 390h–35. Prado Basin natural treatment system project  


Latest version.
  • (a) In general

    The Secretary, in cooperation with the Orange County Water District, shall participate in the planning, design, and construction of natural treatment systems and wetlands for the flows of the Santa Ana River, California, and its tributaries into the Prado Basin.

    (b) Cost sharing

    The Federal share of the cost of the project described in subsection (a) shall not exceed 25 percent of the total cost of the project.

    (c) Limitation

    Funds provided by the Secretary shall not be used for the operation and maintenance of the project described in subsection (a).

    (d) Authorization of appropriations

    There is authorized to be appropriated to carry out this section $10,000,000.

    (e) Sunset of authority

    This section shall have no effect after the date that is 10 years after March 30, 2009.

(Pub. L. 102–575, title XVI, § 1652, as added Pub. L. 111–11, title IX, § 9111(a)(1), Mar. 30, 2009, 123 Stat. 1317.)