§ 6925. Permits for treatment, storage, or disposal of hazardous waste  


Latest version.
  • (a) Permit requirements

    Not later than eighteen months after October 21, 1976, the Administrator shall promulgate regulations requiring each person owning or operating an existing facility or planning to construct a new facility for the treatment, storage, or disposal of hazardous waste identified or listed under this subchapter to have a permit issued pursuant to this section. Such regulations shall take effect on the date provided in section 6930 of this title and upon and after such date the treatment, storage, or disposal of any such hazardous waste and the construction of any new facility for the treatment, storage, or disposal of any such hazardous waste is prohibited except in accordance with such a permit. No permit shall be required under this section in order to construct a facility if such facility is constructed pursuant to an approval issued by the Administrator under section 2605(e) of title 15 for the incineration of polychlorinated biphenyls and any person owning or operating such a facility may, at any time after operation or construction of such facility has begun, file an application for a permit pursuant to this section authorizing such facility to incinerate hazardous waste identified or listed under this subchapter.

    (b) Requirements of permit applicationEach application for a permit under this section shall contain such information as may be required under regulations promulgated by the Administrator, including information respecting—(1) estimates with respect to the composition, quantities, and concentrations of any hazardous waste identified or listed under this subchapter, or combinations of any such hazardous waste and any other solid waste, proposed to be disposed of, treated, transported, or stored, and the time, frequency, or rate of which such waste is proposed to be disposed of, treated, transported, or stored; and(2) the site at which such hazardous waste or the products of treatment of such hazardous waste will be disposed of, treated, transported to, or stored. (c) Permit issuance(1) Upon a determination by the Administrator (or a State, if applicable), of compliance by a facility for which a permit is applied for under this section with the requirements of this section and section 6924 of this title, the Administrator (or the State) shall issue a permit for such facilities. In the event permit applicants propose modification of their facilities, or in the event the Administrator (or the State) determines that modifications are necessary to conform to the requirements under this section and section 6924 of this title, the permit shall specify the time allowed to complete the modifications.(2)(A)(i) Not later than the date four years after November 8, 1984, in the case of each application under this subsection for a permit for a land disposal facility which was submitted before such date, the Administrator shall issue a final permit pursuant to such application or issue a final denial of such application.(ii) Not later than the date five years after November 8, 1984, in the case of each application for a permit under this subsection for an incinerator facility which was submitted before such date, the Administrator shall issue a final permit pursuant to such application or issue a final denial of such application.(B) Not later than the date eight years after November 8, 1984, in the case of each application for a permit under this subsection for any facility (other than a facility referred to in subparagraph (A)) which was submitted before such date, the Administrator shall issue a final permit pursuant to such application or issue a final denial of such application.(C) The time periods specified in this paragraph shall also apply in the case of any State which is administering an authorized hazardous waste program under section 6926 of this title. Interim status under subsection (e) of this section shall terminate for each facility referred to in subparagraph (A)(ii) or (B) on the expiration of the five- or eight-year period referred to in subparagraph (A) or (B), whichever is applicable, unless the owner or operator of the facility applies for a final determination regarding the issuance of a permit under this subsection within—(i) two years after November 8, 1984 (in the case of a facility referred to in subparagraph (A)(ii)), or(ii) four years after November 8, 1984 (in the case of a facility referred to in subparagraph (B)).(3) Any permit under this section shall be for a fixed term, not to exceed 10 years in the case of any land disposal facility, storage facility, or incinerator or other treatment facility. Each permit for a land disposal facility shall be reviewed five years after date of issuance or reissuance and shall be modified as necessary to assure that the facility continues to comply with the currently applicable requirements of this section and section 6924 of this title. Nothing in this subsection shall preclude the Administrator from reviewing and modifying a permit at any time during its term. Review of any application for a permit renewal shall consider improvements in the state of control and measurement technology as well as changes in applicable regulations. Each permit issued under this section shall contain such terms and conditions as the Administrator (or the State) determines necessary to protect human health and the environment. (d) Permit revocation

    Upon a determination by the Administrator (or by a State, in the case of a State having an authorized hazardous waste program under section 6926 of this title) of noncompliance by a facility having a permit under this chapter with the requirements of this section or section 6924 of this title, the Administrator (or State, in the case of a State having an authorized hazardous waste program under section 6926 of this title) shall revoke such permit.

    (e) Interim status(1) Any person who—(A) owns or operates a facility required to have a permit under this section which facility—(i) was in existence on November 19, 1980, or(ii) is in existence on the effective date of statutory or regulatory changes under this chapter that render the facility subject to the requirement to have a permit under this section,(B) has complied with the requirements of section 6930(a) of this title, and(C) has made an application for a permit under this section,shall be treated as having been issued such permit until such time as final administrative disposition of such application is made, unless the Administrator or other plaintiff proves that final administrative disposition of such application has not been made because of the failure of the applicant to furnish information reasonably required or requested in order to process the application. This paragraph shall not apply to any facility which has been previously denied a permit under this section or if authority to operate the facility under this section has been previously terminated.(2) In the case of each land disposal facility which has been granted interim status under this subsection before November 8, 1984, interim status shall terminate on the date twelve months after November 8, 1984, unless the owner or operator of such facility—(A) applies for a final determination regarding the issuance of a permit under subsection (c) of this section for such facility before the date twelve months after November 8, 1984; and(B) certifies that such facility is in compliance with all applicable groundwater monitoring and financial responsibility requirements.(3) In the case of each land disposal facility which is in existence on the effective date of statutory or regulatory changes under this chapter that render the facility subject to the requirement to have a permit under this section and which is granted interim status under this subsection, interim status shall terminate on the date twelve months after the date on which the facility first becomes subject to such permit requirement unless the owner or operator of such facility—(A) applies for a final determination regarding the issuance of a permit under subsection (c) of this section for such facility before the date twelve months after the date on which the facility first becomes subject to such permit requirement; and(B) certifies that such facility is in compliance with all applicable groundwater monitoring and financial responsibility requirements. (f) Coal mining wastes and reclamation permits

    Notwithstanding subsection (a) through (e) of this section, any surface coal mining and reclamation permit covering any coal mining wastes or overburden which has been issued or approved under the Surface Mining Control and Reclamation Act of 1977 [30 U.S.C. 1201 et seq.] shall be deemed to be a permit issued pursuant to this section with respect to the treatment, storage, or disposal of such wastes or overburden. Regulations promulgated by the Administrator under this subchapter shall not be applicable to treatment, storage, or disposal of coal mining wastes and overburden which are covered by such a permit.

    (g) Research, development, and demonstration permits(1) The Administrator may issue a research, development, and demonstration permit for any hazardous waste treatment facility which proposes to utilize an innovative and experimental hazardous waste treatment technology or process for which permit standards for such experimental activity have not been promulgated under this subchapter. Any such permit shall include such terms and conditions as will assure protection of human health and the environment. Such permits—(A) shall provide for the construction of such facilities, as necessary, and for operation of the facility for not longer than one year (unless renewed as provided in paragraph (4)), and(B) shall provide for the receipt and treatment by the facility of only those types and quantities of hazardous waste which the Administrator deems necessary for purposes of determining the efficacy and performance capabilities of the technology or process and the effects of such technology or process on human health and the environment, and(C) shall include such requirements as the Administrator deems necessary to protect human health and the environment (including, but not limited to, requirements regarding monitoring, operation, insurance or bonding, financial reponsibility, drinking water” has the same meaning as provided in regulations under the Safe Drinking Water Act (title XIV of the Public Health Service Act [42 U.S.C. 300f et seq.]).(13) The Administrator may modify the requirements of paragraph (1) in the case of a surface impoundment for which the owner or operator, prior to October 1, 1984, has entered into, and is in compliance with, a consent order, decree, or agreement with the Administrator or a State with an authorized program mandating corrective action with respect to such surface impoundment that provides a degree of protection of human health and the environment which is at a minimum equivalent to that provided by paragraph (1).
(Pub. L. 89–272, title II, § 3005, as added Pub. L. 94–580, § 2, Oct. 21, 1976, 90 Stat. 2808; amended Pub. L. 95–609, § 7(h), Nov. 8, 1978, 92 Stat. 3082; Pub. L. 96–482, §§ 10, 11, Oct. 21, 1980, 94 Stat. 2338; Pub. L. 98–616, title II, §§ 211–213(a), (c), 214(a), 215, 224(b), 243(c), Nov. 8, 1984, 98 Stat. 3240–3243, 3253, 3261; Pub. L. 104–119, § 4(6), (7), Mar. 26, 1996, 110 Stat. 833.)

References In Text

References in Text

The Surface Mining Control and Reclamation Act of 1977, referred to in subsec. (f), is Pub. L. 95–87, Aug. 3, 1977, 91 Stat. 445, as amended, which is classified generally to chapter 25 (§ 1201 et seq.) of Title 30, Mineral Lands and Mining. For complete classification of this Act to the Code, see Short Title note set out under section 1201 of Title 30 and Tables.

The Safe Drinking Water Act, referred to in subsec. (j)(12)(C), is title XIV of act July 1, 1944, as added Dec. 16, 1974, Pub. L. 93–523, § 2(a), 88 Stat. 1660, as amended, which is classified generally to subchapter XII (§ 300f et seq.) of chapter 6A of this title. For complete classification of this Act to the Code see Short Title note set out under section 201 of this title and Tables.

Amendments

Amendments

1996—Subsec. (a). Pub. L. 104–119, § 4(6), substituted “polychlorinated” for “polycholorinated”.

Subsec. (e)(1)(C). Pub. L. 104–119, § 4(7), inserted comma at end of subpar. (C).

1984—Subsec. (a). Pub. L. 98–616, § 211, substituted “an existing facility or planning to construct a new” for “a”, inserted “and the construction of any new facility for the treatment, storage, or disposal of any such hazardous waste”, and inserted at end “No permit shall be required under this section in order to construct a facility if such facility is constructed pursuant to an approval issued by the Administrator under section 2605(e) of title 15 for the incineration of polycholorinated [sic] biphenyls and any person owning or operating such a facility may, at any time after operation or construction of such facility has begun, file an application for a permit pursuant to this section authorizing such facility to incinerate hazardous waste identified or listed under this subchapter.”

Subsec. (c)(1), (2). Pub. L. 98–616, § 213(c), designated existing provisions as par. (1) and added par. (2).

Subsec. (c)(3). Pub. L. 98–616, § 212, added par. (3).

Subsec. (e). Pub. L. 98–616, § 213(a), designated existing provisions as par. (1), redesignated former pars. (1), (2), and (3) thereof as subpars. (A), (B), and (C), respectively, designated existing provisions of previously redesignated subpar. (A) as cl. (i) and added cl. (ii), inserted “This paragraph shall not apply to any facility which has been previously denied a permit under this section or if authority to operate the facility under this section has been previously terminated.” to closing provisions of par. (1), and added pars. (2) and (3).

Subsec. (g). Pub. L. 98–616, § 214(a), added subsec. (g).

Subsec. (h). Pub. L. 98–616, § 224(b), added subsec. (h).

Subsec. (i). Pub. L. 98–616, § 243(c), added subsec. (i).

Subsec. (j). Pub. L. 98–616, § 215, added subsec. (j).

1980—Subsec. (e)(1). Pub. L. 96–482, § 10, substituted “November 19, 1980” for “October 21, 1976”.

Subsec. (f). Pub. L. 96–482, § 11, added subsec. (f).

1978—Subsec (a). Pub. L. 95–609 inserted “treatment, storage, or” after “and after such date the”.

Transfer Of Functions

Transfer of Functions

For transfer of certain enforcement functions of Administrator or other official of Environmental Protection Agency under this chapter to Federal Inspector, Office of Federal Inspector for the Alaska Natural Gas Transportation System, and subsequent transfer to Secretary of Energy, then to Federal Coordinator for Alaska Natural Gas Transportation Projects, see note set out under section 6903 of this title.