United States Code (Last Updated: May 24, 2014) |
Title 33. NAVIGATION AND NAVIGABLE WATERS |
Chapter 26. WATER POLLUTION PREVENTION AND CONTROL |
SubChapter II. GRANTS FOR CONSTRUCTION OF TREATMENT WORKS |
§ 1281. Congressional declaration of purpose
-
(a) Development and implementation of waste treatment management plans and practices It is the purpose of this subchapter to require and to assist the development and implementation of waste treatment management plans and practices which will achieve the goals of this chapter.
(b) Application of technology: confined disposal of pollutants; consideration of advanced techniques Waste treatment management plans and practices shall provide for the application of the best practicable waste treatment technology before any discharge into receiving waters, including reclaiming and recycling of water, and confined disposal of pollutants so they will not migrate to cause water or other environmental pollution and shall provide for consideration of advanced waste treatment techniques.
(c) Waste treatment management area and scope To the extent practicable, waste treatment management shall be on an areawide basis and provide control or treatment of all point and nonpoint sources of pollution, including in place or accumulated pollution sources.
(d) Waste treatment management construction of revenue producing facilities The Administrator shall encourage waste treatment management which results in the construction of revenue producing facilities providing for— (1) the recycling of potential sewage pollutants through the production of agriculture, silviculture, or aquaculture products, or any combination thereof; (2) the confined and contained disposal of pollutants not recycled; (3) the reclamation of wastewater; and (4) the ultimate disposal of sludge in a manner that will not result in environmental hazards. (e) Waste treatment management integration of facilities The Administrator shall encourage waste treatment management which results in integrating facilities for sewage treatment and recycling with facilities to treat, dispose of, or utilize other industrial and municipal wastes, including but not limited to solid waste and waste heat and thermal discharges. Such integrated facilities shall be designed and operated to produce revenues in excess of capital and operation and maintenance costs and such revenues shall be used by the designated regional management agency to aid in financing other environmental improvement programs.
(f) Waste treatment management “open space” and recreational considerations The Administrator shall encourage waste treatment management which combines “open space” and recreational considerations with such management.
(g) Grants to construct publicly owned treatment works (1) The Administrator is authorized to make grants to any State, municipality, or intermunicipal or interstate agency for the construction of publicly owned treatment works. On and after October 1, 1984 , grants under this subchapter shall be made only for projects for secondary treatment or more stringent treatment, or any cost effective alternative thereto, new interceptors and appurtenances, and infiltration-in-flow correction. Notwithstanding the preceding sentences, the Administrator may make grants on and afterOctober 1, 1984 , for (A) any project within the definition set forth in section 1292(2) of this title, other than for a project referred to in the preceding sentence, and (B) any purpose for which a grant may be made under sections 1329(h) and (i) of this title (including any innovative and alternative approaches for the control of nonpoint sources of pollution), except that not more than 20 per centum (as determined by the Governor of the State) of the amount allotted to a State under section 1285 of this title for any fiscal year shall be obligated in such State under authority of this sentence.(2) The Administrator shall not make grants from funds authorized for any fiscal year beginning after June 30, 1974 , to any State, municipality, or intermunicipal or interstate agency for the erection, building, acquisition, alteration, remodeling, improvement, or extension of treatment works unless the grant applicant has satisfactorily demonstrated to the Administrator that—(A) alternative waste management techniques have been studied and evaluated and the works proposed for grant assistance will provide for the application of the best practicable waste treatment technology over the life of the works consistent with the purposes of this subchapter; and (B) as appropriate, the works proposed for grant assistance will take into account and allow to the extent practicable the application of technology at a later date which will provide for the reclaiming or recycling of water or otherwise eliminate the discharge of pollutants. (3) The Administrator shall not approve any grant after July 1, 1973 , for treatment works under this section unless the applicant shows to the satisfaction of the Administrator that each sewer collection system discharging into such treatment works is not subject to excessive infiltration.(4) The Administrator is authorized to make grants to applicants for treatment works grants under this section for such sewer system evaluation studies as may be necessary to carry out the requirements of paragraph (3) of this subsection. Such grants shall be made in accordance with rules and regulations promulgated by the Administrator. Initial rules and regulations shall be promulgated under this paragraph not later than 120 days after October 18, 1972 .(5) The Administrator shall not make grants from funds authorized for any fiscal year beginning after September 30, 1978 , to any State, municipality, or intermunicipal or interstate agency for the erection, building, acquisition, alteration, remodeling, improvement, or extension of treatment works unless the grant applicant has satisfactorily demonstrated to the Administrator that innovative and alternative wastewater treatment processes and techniques which provide for the reclaiming and reuse of water, otherwise eliminate the discharge of pollutants, and utilize recycling techniques, land treatment, new or improved methods of waste treatment management for municipal and industrial waste (discharged into municipal systems) and the confined disposal of pollutants, so that pollutants will not migrate to cause water or other environmental pollution, have been fully studied and evaluated by the applicant taking into account subsection (d) of this section and taking into account and allowing to the extent practicable the more efficient use of energy and resources.(6) The Administrator shall not make grants from funds authorized for any fiscal year beginning after September 30, 1978 , to any State, municipality, or intermunicipal or interstate agency for the erection, building, acquisition, alteration, remodeling, improvement, or extension of treatment works unless the grant applicant has satisfactorily demonstrated to the Administrator that the applicant has analyzed the potential recreation and open space opportunities in the planning of the proposed treatment works.(h) Grants to construct privately owned treatment works A grant may be made under this section to construct a privately owned treatment works serving one or more principal residences or small commercial establishments constructed prior to, and inhabited on, December 27, 1977 , where the Administrator finds that—(1) a public body otherwise eligible for a grant under subsection (g) of this section has applied on behalf of a number of such units and certified that public ownership of such works is not feasible; (2) such public body has entered into an agreement with the Administrator which guarantees that such treatment works will be properly operated and maintained and will comply with all other requirements of section 1284 of this title and includes a system of charges to assure that each recipient of waste treatment services under such a grant will pay its proportionate share of the cost of operation and maintenance (including replacement); and (3) the total cost and environmental impact of providing waste treatment services to such residences or commercial establishments will be less than the cost of providing a system of collection and central treatment of such wastes. (i) Waste treatment management methods, processes, and techniques to reduce energy requirements The Administrator shall encourage waste treatment management methods, processes, and techniques which will reduce total energy requirements.
(j) Grants for treatment works utilizing processes and techniques of guidelines under section 1314(d)(3) of this title The Administrator is authorized to make a grant for any treatment works utilizing processes and techniques meeting the guidelines promulgated under section 1314(d)(3) of this title, if the Administrator determines it is in the public interest and if in the cost effectiveness study made of the construction grant application for the purpose of evaluating alternative treatment works, the life cycle cost of the treatment works for which the grant is to be made does not exceed the life cycle cost of the most cost effective alternative by more than 15 per centum.
(k) Limitation on use of grants for publicly owned treatment works No grant made after
November 15, 1981 , for a publicly owned treatment works, other than for facility planning and the preparation of construction plans and specifications, shall be used to treat, store, or convey the flow of any industrial user into such treatment works in excess of a flow per day equivalent to fifty thousand gallons per day of sanitary waste. This subsection shall not apply to any project proposed by a grantee which is carrying out an approved project to prepare construction plans and specifications for a facility to treat wastewater, which received its grant approval beforeMay 15, 1980 . This subsection shall not be in effect afterNovember 15, 1981 .(l) Grants for facility plans, or plans, specifications, and estimates for proposed project for construction of treatment works; limitations, allotments, advances, etc. (1) After December 29, 1981 , Federal grants shall not be made for the purpose of providing assistance solely for facility plans, or plans, specifications, and estimates for any proposed project for the construction of treatment works. In the event that the proposed project receives a grant under this section for construction, the Administrator shall make an allowance in such grant for non-Federal funds expended during the facility planning and advanced engineering and design phase at the prevailing Federal share under section 1282(a) of this title, based on the percentage of total project costs which the Administrator determines is the general experience for such projects.(2) (A) Each State shall use a portion of the funds allotted to such State each fiscal year, but not to exceed 10 per centum of such funds, to advance to potential grant applicants under this subchapter the costs of facility planning or the preparation of plans, specifications, and estimates. (B) Such an advance shall be limited to the allowance for such costs which the Administrator establishes under paragraph (1) of this subsection, and shall be provided only to a potential grant applicant which is a small community and which in the judgment of the State would otherwise be unable to prepare a request for a grant for construction costs under this section. (C) In the event a grant for construction costs is made under this section for a project for which an advance has been made under this paragraph, the Administrator shall reduce the amount of such grant by the allowance established under paragraph (1) of this subsection. In the event no such grant is made, the State is authorized to seek repayment of such advance on such terms and conditions as it may determine. (m) Grants for State of California projects (1) Notwithstanding any other provisions of this subchapter, the Administrator is authorized to make a grant from any funds otherwise allotted to the State of California under section 1285 of this title to the project (and in the amount) specified in Order WQG 81–1 of the California State Water Resources Control Board. (2) Notwithstanding any other provision of this chapter, the Administrator shall make a grant from any funds otherwise allotted to the State of California to the city of Eureka, California, in connection with project numbered C–06–2772, for the purchase of one hundred and thirty-nine acres of property as environmental mitigation for siting of the proposed treatment plant. (3) Notwithstanding any other provision of this chapter, the Administrator shall make a grant from any funds otherwise allotted to the State of California to the city of San Diego, California, in connection with that city’s aquaculture sewage process (total resources recovery system) as an innovative and alternative waste treatment process. (n) Water quality problems; funds, scope, etc. (1) On and after October 1, 1984 , upon the request of the Governor of an affected State, the Administrator is authorized to use funds available to such State under section 1285 of this title to address water quality problems due to the impacts of discharges from combined storm water and sanitary sewer overflows, which are not otherwise eligible under this subsection, where correction of such discharges is a major priority for such State.(2) Beginning fiscal year 1983, the Administrator shall have available $200,000,000 per fiscal year in addition to those funds authorized in section 1287 of this title to be utilized to address water quality problems of marine bays and estuaries subject to lower levels of water quality due to the impacts of discharges from combined storm water and sanitary sewer overflows from adjacent urban complexes, not otherwise eligible under this subsection. Such sums may be used as deemed appropriate by the Administrator as provided in paragraphs (1) and (2) of this subsection, upon the request of and demonstration of water quality benefits by the Governor of an affected State. (o) Capital financing plan The Administrator shall encourage and assist applicants for grant assistance under this subchapter to develop and file with the Administrator a capital financing plan which, at a minimum— (1) projects the future requirements for waste treatment services within the applicant’s jurisdiction for a period of no less than ten years; (2) projects the nature, extent, timing, and costs of future expansion and reconstruction of treatment works which will be necessary to satisfy the applicant’s projected future requirements for waste treatment services; and (3) sets forth with specificity the manner in which the applicant intends to finance such future expansion and reconstruction. (p) Time limit on resolving certain disputes In any case in which a dispute arises with respect to the awarding of a contract for construction of treatment works by a grantee of funds under this subchapter and a party to such dispute files an appeal with the Administrator under this subchapter for resolution of such dispute, the Administrator shall make a final decision on such appeal within 90 days of the filing of such appeal.
Amendments
1987—Subsec. (g)(1). Pub. L. 100–4, § 316(c), substituted “sentences, the Administrator” for “sentence, the Administrator” and inserted “(A)” after “
Subsec. (p). Pub. L. 100–4, § 201, added subsec. (p).
1981—Subsec. (g)(1). Pub. L. 97–117, § 2(a), inserted provisions restricting, on or after
Subsec. (k). Pub. L. 97–117, § 10(c), inserted provision that subsection not be in effect after
Subsec. (l). Pub. L. 97–117, § 3(a), added subsec. (l).
Subsec. (m). Pub. L. 97–117, § 4, added subsec. (m).
Subsec. (n). Pub. L. 97–117, § 5, added subsec. (n).
Subsec. (o). Pub. L. 97–117, § 6, added subsec. (o).
1980—Subsec. (h). Pub. L. 96–483, § 2(d), struck out text following par. (3), relating to payment to the United States by commercial users of that portion of the cost of construction applicable to treatment of commercial wastes to the extent attributable to the Federal share of the cost of construction.
Subsec. (k). Pub. L. 96–483, § 3, added subsec. (k).
1977—Subsec. (g)(5). Pub. L. 95–217, § 12, added par. (5).
Subsec. (g)(6). Pub. L. 95–217, § 13, added par. (6).
Subsec. (h). Pub. L. 95–217, § 14, added subsec. (h).
Subsec. (i). Pub. L. 95–217, § 15, added subsec. (i).
Subsec. (j). Pub. L. 95–217, § 16, added subsec. (j).
Effective Date Of Amendment
Pub. L. 96–483, § 2(g),
Miscellaneous
Pub. L. 105–174, title III,
Pub. L. 104–303, title V, § 586,
Pub. L. 104–204, title III,
Pub. L. 104–182, title III, § 307,
Pub. L. 105–65, title III,
Pub. L. 105–65, title III,
Similar provisions were contained in the following prior appropriation acts:
Pub. L. 104–204, title III,
Pub. L. 104–134, title I, § 101(e) [title III],
Pub. L. 103–327, title III,
Pub. L. 103–124, title III,
Pub. L. 102–389, title III,
Pub. L. 102–139, title III,
Pub. L. 101–507, title III,
Pub. L. 104–134, title I, § 101(e) [title III],
Pub. L. 104–134, title I, § 101(e) [title III],
Pub. L. 99–396, § 12(b),
Pub. L. 92–500, § 12,